Highway 16 Eastbound |
Highway 16 (Yellowhead Highway), eastbound. Construction work between 11th Ave E and Prince George St (Prince Rupert). Until Thu May 15, 2025 at 7:00 PM PDT. Right lane closed. Secondary Eastbound lane closed. No delays expected. Last updated Thu Apr 25 at 8:40 AM PDT. (DBC-62476) |
Highway 16 |
Highway 16 (Yellowhead Highway). Road sweeping between Port Edward Turnoff and Rainbow Avalanche Gates for 13.5 km (7 to 21 km east of Prince Rupert). Until Wed May 8 at 5:00 PM PDT. From 8:00 AM to 5:00 PM PDT on weekends, Monday, Tuesday, Wednesday and Friday. Slow moving vehicles. Last updated Tue Apr 30 at 12:47 PM PDT. (DBC-63396) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Paving operations between Moricetown Overhead Bridge and Nouch Rd for 26.0 km (7 km west of Smithers to Witset (Moricetown)). Until Sat Jun 15 at 7:00 PM PDT. Single lane alternating traffic. Expect up to 20 minute delays. Next update time Sat Jun 15 at 7:00 PM PDT. Last updated Fri May 3 at 6:11 PM PDT. (DBC-63080) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Bridge maintenance between George St and Page Rd for 0.9 km (Fort Fraser). Until Thu Jun 27. Right lane closed. Expect delays. Nechako Bridge rehabilitation/construction; vehicle width is restricted to 4m maximum. Last updated Mon Apr 22 at 12:41 PM PDT. (DBC-59853) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Spiller Rd and Telegraph Rd for 0.1 km (Fort Fraser). Until Fri May 10 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic. Watch for traffic control. Last updated Thu Apr 25 at 4:01 PM PDT. (DBC-63213) |
Highway 16 Westbound |
Highway 16 (Yellowhead Highway), westbound. Utility work between Pine Ave and Thackery Rd for 1.1 km (Vanderhoof). Until Thu Jan 16, 2025 at 4:00 PM PST. Lane Closure. Watch for traffic control. Last updated Thu Dec 21, 2023 at 8:15 AM PST. (DBC-59181) |
Highway 16 Both Directions |
Highway 16 (Yellowhead Highway), in both directions. Road construction work between Guest Rd and Shallow Bay Rd (7 km west of Bednesti Norman). Until Mon Jul 15. Highway widening with turning, acceleration, deacceleration and wider shoulders. Temporary closures for equipment crossing, and single lane alternating traffic as required for construction and paving. Last updated Wed Apr 10 at 6:39 PM PDT. (DBC-62504) |